[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117775":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1117775,789,1,"单选题","工程监理人员认为工程施工不符合工程设计要求时，其正确的做法是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","要求建筑施工企业改正",true,{"key":16,"text":17,"correct":18},"B","报告建设单位要求设计单位改正",false,{"key":20,"text":21,"correct":18},"C","下达设计整改通知单",{"key":23,"text":24,"correct":18},"D","报告设计单位要求建设单位改正","2021\u002F2020教材P44页 工程监理人员认为工程施工不符合工程设计要求、施工技术标准和合同约定的，有权要求建筑施工企业改正。工程监理人员发现工程设计不符合建筑工程质量标准或者合同约定的质量要求的，应当报告建设单位要求设计单位改正。@##",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]