[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117771":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1117771,789,1,"单选题","下列关于城市轨道交通地下工程风险管理的说法中，正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","城市轨道交通地下工程比较特殊，不必实施动态风险管理",false,{"key":16,"text":17,"correct":18},"B","风险管理应编制风险控制预案、建立重大风险事故呈报制度。",true,{"key":20,"text":21,"correct":14},"C","风险管理实施的主要阶段包括施工准备期、施工期和竣工验收。",{"key":23,"text":24,"correct":14},"D","因工程较特殊，风险管理可不编制风险控制预案","2021\u002F2020教材P40页 9.1.3城市轨道交通地下工程施工风险管理应编制风险控制预案、建立重大风险事故呈报制度。 9.1.4城市轨道交通地下工程施工风险管理实施的主要阶段宜包括：施工准备期、施工期、车辆及机电系统安装和调试、试运行和竣工验收。” @##",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]