[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117736":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1117736,789,1,"单选题","风险量指的是（）和损失发生的概率",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","不确定损失程度",true,{"key":16,"text":17,"correct":18},"B","错误决策",false,{"key":20,"text":21,"correct":18},"C","不合理指令",{"key":23,"text":24,"correct":18},"D","设计变更","2021\u002F2020教材P37页 风险量指的是不确定损失程度和损失发生的概率",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]