[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117704":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1117704,789,1,"单选题","项目管理目标责任书应在()之前，由法定代表人或其授权人与项目经理协商制定。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目实施",true,{"key":16,"text":17,"correct":18},"B","项目完工",false,{"key":20,"text":21,"correct":18},"C","项目批准",{"key":23,"text":24,"correct":18},"D","项目验收","2021\u002F2020教材P33页 项目管理责任书应在项目实施之前，由法定代表人或其授权人与项目经理协商制定。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]