[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117698":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1117698,789,1,"单选题","根据《建设工程施工合同（示范文本）》(GF-2013-0201)，项目经理因特殊情况授权其下属人员履行其某项工作职责的，应选派有相应能力的人员并提前()将上述人员及授权情况书面通知监理人并征得发包人同意",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","14天",false,{"key":16,"text":17,"correct":18},"B","7天",true,{"key":20,"text":21,"correct":14},"C","28天",{"key":23,"text":24,"correct":14},"D","3天","2021\u002F2020教材P31页 3.2.5项目经理因特殊情况授权其下属人员履行其某项工作职责的，该下属人员应具备履行相应职责的能力，并应提前7天将上述人员的姓名和授权范围书面通知监理人，并征得发包人书面同意。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]