[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117679":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1117679,789,1,"单选题","对建设工程项目施工负有全面管理责任的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","企业法定代表人",false,{"key":16,"text":17,"correct":18},"B","项目经理",true,{"key":20,"text":21,"correct":14},"C","项目总工程师",{"key":23,"text":24,"correct":14},"D","总监理工程师","2021\u002F2020教材P35页 项目经理对施工承担全面管理的责任",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]