[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117644":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1117644,789,1,"单选题","某施工企业承担了某项施工任务，在进行施工成本控制时，为及时了解该施工项目的盈亏情况，需要与实际施工成本进行比较的成本项是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工成本规划中的相应成本项",false,{"key":16,"text":17,"correct":18},"B","工程合同价中的相应成本项",true,{"key":20,"text":21,"correct":14},"C","工程投标价中的相应成本项",{"key":23,"text":24,"correct":14},"D","工程款支付中的相应成本项","2021\u002F2020教材P29页 在进行施工成本控制时，为及时了解该施工项目的盈亏情况，实际施工成本应和工程合同价中的相应成本项进行比较，故选B。和选项A比较反映的是成本规划完成情况，与选项C、D比较，则没有实际意义。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]