[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117605":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1117605,789,1,"单选题","控制项目目标的主要措施中，（）是最重要的措施。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","技术措施",false,{"key":16,"text":17,"correct":14},"B","管理措施",{"key":19,"text":20,"correct":21},"C","组织措施",true,{"key":23,"text":24,"correct":14},"D","经济措施","2021\u002F2020教材P28页 二、项目目标动态控制的纠偏措施组织论的一个重要结论是：组织是目标能否实现的决定性因素，应充分重视组织措施对项目目标控制的作用。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]