[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117589":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1117589,789,1,"单选题","主要技术经济指标中包括工期、资源消耗的均衡性、机械设备的利用程度的施工组织设计类型是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工组织总设计",false,{"key":16,"text":17,"correct":14},"B","单项工程施工组织设计",{"key":19,"text":20,"correct":21},"C","单位工程施工组织设计",true,{"key":23,"text":24,"correct":14},"D","分部（分项）工程施工组织设计","2021\u002F2020教材P25页 2、单位工程施工组织设计的主要内容（8）主要技术经济指标（工期，资源消耗的均衡性，机械设备的利用程度等）。@##",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]