[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117523":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1117523,789,1,"单选题","编制项目进度项编码、合同编码、工程档案编码等项目信息编码的基础是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目结构图和项目结构编码",true,{"key":16,"text":17,"correct":18},"B","组织结构图和组织结构编码",false,{"key":20,"text":21,"correct":18},"C","工作流程图和项目结构编码",{"key":23,"text":24,"correct":18},"D","工作流程图和组织结构编码","2021\u002F2020教材P12页 项目结构图和项目结构的编码是编制上述其他编码的基础。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]