[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117511":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1117511,789,1,"单选题","项目结构图、组织结构图和合同结构图的涵义不同，其表达的方式也有所不同。下图反映了一个建设项目的业主与总承包商，以及总承包商与分包商之间的某种关系，这种关系是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","指令关系",false,{"key":16,"text":17,"correct":14},"B","项目结构关系",{"key":19,"text":20,"correct":14},"C","工作任务关系",{"key":22,"text":23,"correct":24},"D","合同关系",true,"2021\u002F2020教材P13页 合同结构图反映一个建设项目参与单位之间的合同关系。矩形框连接的表达：双向箭线",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]