[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117479":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1117479,789,1,"单选题","某建筑企业准备实施一个大型地铁建设项目的施工管理任务，为提高项目部组织系统的运行效率，决定设置纵向和横向工作部门以减少项目组织结构的层次，则该项目所选用的组织结构模式是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","线性组织结构",false,{"key":16,"text":17,"correct":18},"B","矩阵组织结构",true,{"key":20,"text":21,"correct":14},"C","职能组织结构",{"key":23,"text":24,"correct":14},"D","直线职能组织结构","2021\u002F2020教材P15页 一个大型建设项目如采用矩阵组织结构模式，则纵向工作部门可以是投资控制、进度控制、质量控制、合同管理、信息管理、人事管理、财务管理和物资管理等部门，而横向工作部门可以是各子项目的项目管理部。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]