[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117474":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1117474,789,1,"单选题","钢结构深化设计工作流程，属于工作流程组织中的（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","管理工作流程组织",false,{"key":16,"text":17,"correct":18},"B","物质流程组织",true,{"key":20,"text":21,"correct":14},"C","信息处理工作流程组织",{"key":23,"text":24,"correct":14},"D","设计工作流程组织","2021\u002F2020教材P22页 工作流程组织包括：①管理工作流程组织，如投资控制、进度控制、合同管理、付款和设计变更等流程；②信息处理工作流程组织，如与生成月度进度报告有关的数据处理流程；③物质流程组织，如钢结构深化设计工作流程、弱电工程物资采购工作流程、外立面施工工作流程等。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]