[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117446":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1117446,789,1,"单选题","项目管理组织结构编码依据()，对每一个工作部门进行编码。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目管理施工图",false,{"key":16,"text":17,"correct":18},"B","项目管理的项目结构图",true,{"key":20,"text":21,"correct":14},"C","项目管理的组织结构图",{"key":23,"text":24,"correct":14},"D","项目管理的结构控制图","2021\u002F2020教材P12页 项目结构的编码依据项目结构图，对项目结构的每一层的每一个组成部分进行编码。@##",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]