[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117444":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1117444,789,1,"单选题","为了加快施工进度，施工协调部门根据项目经理的要求，落实有关夜间施工条件、组织夜间施工的工作，属于管理职能中的()环节。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","执行",true,{"key":16,"text":17,"correct":18},"B","检查",false,{"key":20,"text":21,"correct":18},"C","决策",{"key":23,"text":24,"correct":18},"D","筹划","2021\u002F2020教材P20页 (4)执行——落实夜班施工的条件，组织夜班施工。@##",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]