[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117410":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1117410,789,1,"单选题","下列关于建设工程项目管理的说法，正确的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目管理的核心任务是项目策划和项目控制",false,{"key":16,"text":17,"correct":14},"B","建设工程项目的全寿命周期包括可行性研究阶段、实施阶段和使用阶段",{"key":19,"text":20,"correct":21},"C","业主方的进度目标是项目动用的时间目标",true,{"key":23,"text":24,"correct":14},"D","编制项目设计任务书属于决策阶段的工作","2021\u002F2020教材P2页 建设项目管理的核心任务是项目的目标控制，故选项A错误。建设工程项目的全寿命周期包括项目的决策阶段、实施阶段和使用阶段。故选项B错误。编制项目建议书属于决策阶段的任务，编制设计任务书属于设计准备阶段的任务。故选项D错误。 @##",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]