[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117406":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1117406,789,1,"单选题","业主方的项目管理工作涉及项目（）的全过程。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","决策阶段",false,{"key":16,"text":17,"correct":14},"B","设计阶段",{"key":19,"text":20,"correct":14},"C","施工阶段",{"key":22,"text":23,"correct":24},"D","实施阶段",true,"2021\u002F2020教材P3页 业主方的项目管理工作涉及项目实施阶段的全过程，即在设计前的准备阶段、设计阶段、施工阶段、动用前准备阶段和保修期。@##",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]