[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117391":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1117391,789,1,"单选题","某建设项目采用施工总承包模式，甲施工总承包单位征得发包人同意，将部分专业工程分包给乙分包商，业主将幕墙工程分包给丙分包商，业主及甲、乙、丙三家单位在施工管理中的正确关系是()",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","甲施工总承包单位不承担施工任务，只负责对乙分包商的组织管理和协调",false,{"key":16,"text":17,"correct":14},"B","丙分包商在施工中只听从业主的指令",{"key":19,"text":20,"correct":21},"C","甲施工总承包单位负责对乙分包商和丙分包商的组织管理和协调",true,{"key":23,"text":24,"correct":14},"D","乙分包商和丙分包商与甲施工总承包单位之间既是合同关系，又是指令关系","2021\u002F2020教材P6页 二、施工总承包方的管理任务。@##",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]