[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117364":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1117364,789,1,"单选题","下列选项中，属于项目设计前准备阶段主要工作的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","编制项目建议书",false,{"key":16,"text":17,"correct":14},"B","编制项目可行性研究报告",{"key":19,"text":20,"correct":14},"C","编制项目总成本计划",{"key":22,"text":23,"correct":24},"D","编制设计任务书",true,"2021\u002F2020教材P3页 图2Z101011设计准备阶段：编制设计任务书。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]