[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117345":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1117345,789,1,"单选题","供货方的项目管理工作主要在()阶段进行。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","决策",false,{"key":16,"text":17,"correct":14},"B","设计",{"key":19,"text":20,"correct":21},"C","施工",true,{"key":23,"text":24,"correct":14},"D","保修","2021\u002F2020教材P5页 供货方的项目管理工作主要在施工阶段进行。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]