[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117342":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1117342,789,1,"单选题","甲单位拟新建一电教中心，经设计招标，由乙设计院承担该项目设计任务。下列目标中，不属于乙设计院项目管理目标的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目投资目标",false,{"key":16,"text":17,"correct":14},"B","设计进度目标",{"key":19,"text":20,"correct":21},"C","施工质量目标",true,{"key":23,"text":24,"correct":14},"D","设计成本目标","2021\u002F2020教材P4页 大家要注意施工质量目标是施工单位的，而设计的质量目标才是设计的。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]