[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117252":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1117252,789,1,"单选题","根据不同风险水平的风险控制措施计划表，对于“中度的”风险，宜采取的措施是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","直至风险降低后才能开始工作，当风险涉及正在进行中的工作时，应采取应急计划",false,{"key":16,"text":17,"correct":14},"B","考虑投资效果更佳的解决方案或不增加额外成本的改进措施",{"key":19,"text":20,"correct":14},"C","只有当风险已经降低到“可容许的”水平时，才能开始继续工作",{"key":22,"text":23,"correct":24},"D","应努力降低风险，并在规定的时间期限内实施降低风险的措施",true,"",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]