[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117231":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1117231,789,1,"单选题","建设工程施工项目开工前编制的工程测量控制方案应由（ ）批准后实施。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目经理",false,{"key":16,"text":17,"correct":14},"B","公司技术负责人",{"key":19,"text":20,"correct":14},"C","公司总工程师",{"key":22,"text":23,"correct":24},"D","项目技术负责人",true,"",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]