[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117195":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1117195,789,1,"单选题","某工程单目标双代号网络计划如下图所示，图中的错误是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","有多个起点节点",false,{"key":16,"text":17,"correct":18},"B","有多个终点节点",true,{"key":20,"text":21,"correct":14},"C","有双向箭头联线",{"key":23,"text":24,"correct":14},"D","有循环回路","",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]