[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117165":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1117165,789,1,"单选题","编制大中型建设工程项目施工成本支出计划时，要在项目总的方面考虑总的预备费，也要在（）中考虑不可预见费。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","前期工作",false,{"key":16,"text":17,"correct":18},"B","主要分项工程",true,{"key":20,"text":21,"correct":14},"C","企业管理费",{"key":23,"text":24,"correct":14},"D","所有的分项工程","在编制成本支出计划时，要在项目总的方面考虑总的预备费，也要在主要的分项工程中安排适当的不可预见费。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]