[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117156":3},{"question":4,"library":22},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":21},1117156,789,1,"单选题","下列时间-成本累计曲线中，符合施工计划成本变化规律的曲线是（）。",[11,14,17,19],{"key":12,"text":12,"correct":13},"A",true,{"key":15,"text":15,"correct":16},"B",false,{"key":18,"text":18,"correct":16},"C",{"key":20,"text":20,"correct":16},"D","",{"id":6,"name":23,"category":24,"favorite":25},"二建建设工程施工管理","建筑工程",0]