[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117124":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1117124,789,1,"单选题","根据我国现行规定，发包人安全文明施工费预付的时间和金额分别为（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","付时间为工程开工后42 天内，金额不低于当年施工进度计划的安全文明施工费总额的60%",false,{"key":16,"text":17,"correct":14},"B","预付时间为工程开工后42 天内，金额不低于当年施工进度计划的安全文明施工费总额的50%",{"key":19,"text":20,"correct":21},"C","预付时间为工程开工后28 天内，金额不低于当年施工进度计划的安全文明施工费总额的50%",true,{"key":23,"text":24,"correct":14},"D","预付时间为工程开工后28 天内，金额不低于当年施工进度计划的安全文明施工费总额的80%","发包人应在工程开工后的28天内预付不低于当年施工进度计划的安全文明施工费总额的50%。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]