[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117109":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1117109,789,1,"单选题","编制标准砖砌体材料消耗定额时，砖的消耗量应按（）确定。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","净用量",false,{"key":16,"text":17,"correct":18},"B","净用量加损耗量",true,{"key":20,"text":21,"correct":14},"C","一次损耗量",{"key":23,"text":24,"correct":14},"D","损耗量加补损量","材料消耗定额，主要包括确定直接使用在工程上的材料净用量和在施工现场内运输和操作过程中的不可避免的废料和损耗。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]