[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117014":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1117014,789,1,"单选题","项目管理的核心任务是项目的（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","组织协调",false,{"key":16,"text":17,"correct":18},"B","目标控制",true,{"key":20,"text":21,"correct":14},"C","合同管理",{"key":23,"text":24,"correct":14},"D","风险管理","项目管理的核心任务是项目的目标控制。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程施工管理","建筑工程",0]