[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1117117":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1117117,788,1,"单选题","根据《合同法》规定，当事人对合同变更的内容约定不明确的，推定为()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","变更",false,{"key":16,"text":17,"correct":14},"B","重新协定",{"key":19,"text":20,"correct":14},"C","原则上变更",{"key":22,"text":23,"correct":24},"D","未变更",true,"当事人对合同变更的内容约定不明确的，推定为未变更。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]