[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1116808":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1116808,788,1,"单选题","（2020年真题）根据《实施工程建设强制性标准监督规定》，对工程建设规划阶段执行强制性标准的情况，实施监督的机构是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设项目规划审查机构",true,{"key":16,"text":17,"correct":18},"B","施工图设计文件审查单位",false,{"key":20,"text":21,"correct":18},"C","建筑安全监督管理机构",{"key":23,"text":24,"correct":18},"D","工程质量监督机构","P263-265 建设项目规划审查机构应当对工程建设规划阶段执行强制性标准的情况实施监督。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]