[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1116686":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1116686,788,1,"单选题","（2019年） 暂时不能开工的建设用地，超过（ ）的，应当进行绿化、铺装或者遮盖。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1 个月",false,{"key":16,"text":17,"correct":18},"B","3 个月",true,{"key":20,"text":21,"correct":14},"C","2 个月",{"key":23,"text":24,"correct":14},"D","6 个月","暂时不能开工的建设用地，超过 3 个月的，应当进行绿化、铺装或者遮盖。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]