[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1116436":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1116436,788,1,"单选题","（2016年） 关于建设工程施工合同变更的说法，正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","合同变更内容约定不明确，推定为未变更",true,{"key":16,"text":17,"correct":18},"B","合同变更与工程变更范围一致",false,{"key":20,"text":21,"correct":18},"C","合同变更协议自签字之日起生效",{"key":23,"text":24,"correct":18},"D","发包人可依据其单方意见变更合同","合同变更的范围广于工程变更，B 选项错误；合同变更须遵循法定的程序，法律、行政法规规变 更合同事项应当办理批准、登记手续的，应当依法办理相应手续。如果没有履行法定程序，即使当事人已协议变更了合同，其变更内容也不发生法律效力。C 选项错误；合同变更不能单方进行，必须双方协商一 致。D 选项错误。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]