[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1116388":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1116388,788,1,"单选题","（2020年真题）关于招标文件的说法。正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","招标人对已发出的招标文件进行必要的澄清的，该澄清的内容不得再次澄清",false,{"key":16,"text":17,"correct":14},"B","招标人对已发出的招标文件进行必要的修改的，应当在招标文件要求提交投标文件截止时间至少10日前",{"key":19,"text":20,"correct":14},"C","招标人对已发出的招标文件进行必要的修改的，应当以电话等即时通讯方式及时通知所有获取招标文件的潜在招标人",{"key":22,"text":23,"correct":24},"D","招标文件不得要求或者标明特定的生产供应者以及含有倾向或者排斥潜在投标人的内容",true,"P75-81 《招标投标法》还规定，招标文件不得要求或者标明特定的生产供应者以及含有倾向或者排斥潜在投标人的其他内容。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]