[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1116371":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1116371,788,1,"单选题","（2016年） 关于投标文件的补充、修改与撤回的说法，正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","撤回已提交的投标文件，应当在投标截止时间前进行",true,{"key":16,"text":17,"correct":18},"B","撤回已提交的投标文件，应当经过招标人的同意",false,{"key":20,"text":21,"correct":18},"C","补充、修改已提交的投标文件，应当在提交投标保证金之前进行",{"key":23,"text":24,"correct":18},"D","撤回已提交的投标文件，应当以书面形式通知其他投标人","《招标投标法》规定，投标人在招标文件要求提交投标文件的截止时间前，可以补充、修改或者 撤回已提交的投标文件，并书面通知招标人。补充、修改的内容为投标文件的组成部分。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]