[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1116365":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1116365,788,1,"单选题","（2014年） 投标人或者其他利害关系人对依法必须进行招标的项目的评标结果有异议的，应当在（ ）提出。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","中标候选人公示期间",true,{"key":16,"text":17,"correct":18},"B","中标通知书发出之后",false,{"key":20,"text":21,"correct":18},"C","合同谈判期间",{"key":23,"text":24,"correct":18},"D","评标报告提交之前","招标投标法实施条例规定，投标人或者其他利害关系人对依法必须进行招标的项目的评标结果有 异议的，应在中标候选人公示期间提出。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]