[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1116236":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1116236,788,1,"单选题","位于甲省的某项目产生大量建筑垃圾，经协商可转移至乙省某地填埋，但需要途径丙省辖区，则下列观点正确的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","无需经任何部门许可",false,{"key":16,"text":17,"correct":14},"B","应当向乙省环保部门报告并经丙省环保部门许可",{"key":19,"text":20,"correct":14},"C","应向丙省环保部门报告并经甲省环保部门许可",{"key":22,"text":23,"correct":24},"D","应向甲省环保部门报告并经乙省环保部门许可",true,"2020版教材P181 转移固体废物出省、自治区、直辖市行政区域贮存、处置的，应当向固体废物移出地的省、自治区、直辖市人民政府环境保护行政主管部门提出申请。 移出地的省、自治区、直辖市人民政府环境保护行政主管部门应当商经接受地的省、自治区、直辖市人民政府环境保护行政主管部门同意后，方可批准转移该固体废物出省、自治区、直辖市行政区域。未经批准的，不得转移。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]