[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1115862":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1115862,788,1,"单选题","施工企业不服建设行政主管部门对其作出的责令停产整顿的决定，欲提起行政复议。该行政复议申请应从企业知道该具体行政行为之日起的一定期限内提出。该期限的天数是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","15",false,{"key":16,"text":17,"correct":14},"B","30",{"key":19,"text":20,"correct":14},"C","45",{"key":22,"text":23,"correct":24},"D","60",true,"2020版教材P346页 公民、法人或者其他组织认为具体行政行为侵犯其合法权益的，可以自知道该具体行政行为之日起60日内提出行政复议申请；但法律规定的申请期限超过60日的除外。因不可抗力或者其他正当理由耽误法定申请期限的，申请期限自障碍消除之日起继续计算。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]