[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1115600":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1115600,788,1,"单选题","以下关于建筑节能的说法，错误的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","企业可以制定严于国家标准的企业节能标准",false,{"key":16,"text":17,"correct":14},"B","国家实行固定资产项目节能评估和审查制度",{"key":19,"text":20,"correct":14},"C","不符合强制性节能标准的项目不得开工建设",{"key":22,"text":23,"correct":24},"D","建筑节能工程验收重点是检查建筑节能工程是否满足施工及规范要求",true,"2020版教材P290页 建筑节能工程验收重点是检查建筑节能工程效果是否满足设计及规范要求，监理和施工单位应加强和重视节能验收工作，对验收中发现的工程实物质量问题及时解决。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]