[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1115597":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1115597,788,1,"单选题","项目档案验收组在检查一列入城建档案馆接收范围工程的工程档案资料时，发现施工图及说明不符合档案规范要求，遂提出了整改意见，项目竣工验收前对存在的问题进行整改，并进行复查的单位应该是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设单位（法人）",true,{"key":16,"text":17,"correct":18},"B","设计单位",false,{"key":20,"text":21,"correct":18},"C","施工单位",{"key":23,"text":24,"correct":18},"D","监理单位","2020版教材P287页 掌握建设工程档案的移交，建设单位在工程竣工验收后3个月内，必须向城建档案馆移交一套符合规定的工程档案。凡建设单位档案不齐全的，应当限期补充。对改建、扩建和维修工程，建设单位应当组织设计、施工单位据实修改、补充和完善原工程档案",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]