[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1115587":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1115587,788,1,"单选题","发承包双方在合同中对竣工结算文件提交、审核的期限没有明确约定，而且国家也没有规定的，可认为其约定期限均为()日。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","15",false,{"key":16,"text":17,"correct":18},"B","28",true,{"key":20,"text":21,"correct":14},"C","35",{"key":23,"text":24,"correct":14},"D","45","2020版教材P291页 《建筑工程施工发包与承包计价管理办法》规定，发承包双方在合同中对竣工结算文件提交、审核的期限没有明确约定的，应当按照国家有关规定执行；国家没有规定的，可认为其约定期限均为28日。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]