[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1115540":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1115540,788,1,"单选题","建设单位不得明示或暗示施工单位违反（）标准。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程建设国家",false,{"key":16,"text":17,"correct":14},"B","工程建设行业标准",{"key":19,"text":20,"correct":21},"C","工程建设强制性标准",true,{"key":23,"text":24,"correct":14},"D","工程建设企业标准","2020版教材P276页 《建设工程质量管理条例》进一步规定，建设工程发包单位，不得迫使承包方以低于成本的价格竞标，不得任意压缩合理工期。建设单位不得明示或者暗示设计单位或者施工单位违反工程建设强制性标准，降低建设工程质量。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]