[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1115392":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1115392,788,1,"单选题","某施工单位制定了施工生产安全事故应急救援预案，按规定该应急预案应定期修订，并将修订情况记录并归档。定期修订的期限至少是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","半年",false,{"key":16,"text":17,"correct":14},"B","1年",{"key":19,"text":20,"correct":14},"C","2年",{"key":22,"text":23,"correct":24},"D","3年",true,"2020版教材P242页 《生产安全事故应急预案管理办法》规定，生产经营单位制定的应急预案应当至少每3年修订一次，预案修订情况应有记录并归档。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]