[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1114839":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1114839,788,1,"单选题","关于合同价款的确定，下列说法错误的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","应当考虑市场环境和生产要素价格变化对合同价款的影响",false,{"key":16,"text":17,"correct":14},"B","实行工程量清单计价的建筑工程，鼓励发承包双方采用单价方式确定合同价款",{"key":19,"text":20,"correct":21},"C","紧急抢险、救灾的建筑工程，发承包双方可以采用固定价格方式确定合同价款",true,{"key":23,"text":24,"correct":14},"D","建设规模较小、技术难度较低的建筑工程，可以采用总价方式确定合同价款","2020版教材P113页 紧急抢险、救灾以及施工技术特别复杂的建筑工程，发承包双方可以采用成本加酬金方式确定合同价款",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]