[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1114647":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1114647,788,1,"单选题","招标人与中标人不按照招标文件和中标人的投标文件订立合同的，或者招标人、中标人订立背离合同实质性内容的协议的，责令改正；可以处中标项目金额（）罚款。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","3‰～5‰",false,{"key":16,"text":17,"correct":18},"B","5‰～10‰",true,{"key":20,"text":21,"correct":14},"C","5‰～15‰",{"key":23,"text":24,"correct":14},"D","10‰～15‰","2020版教材P89页 招标人与中标人不按照招标文件和中标人的投标文件订立合同的，或者招标人、中标人订立背离合同实质性内容的协议的，责令改正；可以处中标项目金额5‰以上10‰以下的罚款。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]