[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1114646":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1114646,788,1,"单选题","投标人或者其他利害关系人对评标结果有异议的，应当在（）提出。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","中标候选人公示期间",true,{"key":16,"text":17,"correct":18},"B","中标结果公布后3日内",false,{"key":20,"text":21,"correct":18},"C","中标通知书下达前",{"key":23,"text":24,"correct":18},"D","正式合同签订前","2020版教材P87页 投标人或者其他利害关系人对依法必须进行招标的项目的评标结果有异议的，应当在中标候选人公示期间提出",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]