[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1114305":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1114305,788,1,"单选题","对固体废物污染环境防治设施的验收应当与对主体工程的验收（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","依次进行",false,{"key":16,"text":17,"correct":14},"B","先验收固体废物污染环境保护防治设施，后验收主体工程",{"key":19,"text":20,"correct":14},"C","先主体工程，后验收固体废物污染环境保护防治设施",{"key":22,"text":23,"correct":24},"D","同时进行",true,"本题考查的是建设项目固体废物污染环境的防治。对固体废物污染环境防治设施的验收应当与对主体工程的验收同时进行。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]