[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1114102":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1114102,788,1,"单选题","关于建筑活动中发生的债的说法，正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","对于施工任务，建设单位是债权人，施工企业是债务人",true,{"key":16,"text":17,"correct":18},"B","对于建筑材料买卖合同中建筑材料的交付，材料供应商是债权人",false,{"key":20,"text":21,"correct":18},"C","在施工中产生噪音，扰乱居民，不会有债发生",{"key":23,"text":24,"correct":18},"D","材料供应商为施工企业自愿保管财物不会发生债","债是按照合同的约定或者按照法律规定，在当事人之间产生的特定的权利和义务关系，享有权利的人是债权人，负有义务的人是债务人。债权人有权要求债务人按照合同的约定或者依照法律的规定履行义务。债是特定当事人之间的法律关系。债权人只能向特定的人主张自己的权利，债务人也只需向享有该项权利的特定人履行义务，即债的相对性。建设工程债产生根据有合同、侵权、无因管理和不当得利。",{"id":6,"name":27,"category":28,"favorite":29},"二建建设工程法规及相关知识","建筑工程",0]