[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,7,50,2160,[13,34,46,58,70,82,94,106,118,130,142,153,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,393,405,413,423,435,447,457,465,476,488,500,512,523,535,543,555,566,578,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1112145,1,"单选题","用电计量装置安装完毕应由（ ）确认。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","监理验收",false,{"key":24,"text":25,"correct":22},"B","组织专家验收",{"key":27,"text":28,"correct":29},"C","供电部门检查",true,{"key":31,"text":32,"correct":22},"D","使用单位","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1112146,"供电方案的有效期，是指从供电方案正式通知书发出之日起至交纳供电贴费并受电工程开工日为止。低压供电方案的有效期为（ ），逾期注销。",[38,40,42,44],{"key":20,"text":39,"correct":29},"3个月",{"key":24,"text":41,"correct":22},"6个月",{"key":27,"text":43,"correct":22},"9个月",{"key":31,"text":45,"correct":22},"12个月",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1112147,"在电力设施保护区内允许取土的范围内取土时，所形成的坡面与地平线之间的夹角，一般不得大于（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"30°",{"key":24,"text":53,"correct":22},"35°",{"key":27,"text":55,"correct":22},"40°",{"key":31,"text":57,"correct":29},"45°",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1112148,"有关电力线路保护区说法，不正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"电压在110kV的架空电力线路保护区是导线边缘向外侧延伸的距离为10m",{"key":24,"text":65,"correct":29},"地下电缆为电缆线路地面标桩两侧各1m所形成的两平行线内的区域",{"key":27,"text":67,"correct":22},"江河电缆一般不小于线路两侧各100m所形成的两平行线内的水域",{"key":31,"text":69,"correct":22},"不得在距电力设施周围500m范围内进行爆破作业",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1112149,"任何单位或个人不得在距35KV及以下架空电力线路杆塔、拉线周围的（ ）内取土、打桩。",[74,76,78,80],{"key":20,"text":75,"correct":29},"5m",{"key":24,"text":77,"correct":22},"10m",{"key":27,"text":79,"correct":22},"15m",{"key":31,"text":81,"correct":22},"20m",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1112150,"在电力设施保护区内或附近施工作业的要求不包括（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"认真进行图纸会审",{"key":24,"text":89,"correct":29},"制定的施工方案不用考虑周边电力设施的实情",{"key":27,"text":91,"correct":22},"编制施工方案时，尽量邀请电力管理部门或电力设施管理部门派员参加",{"key":31,"text":93,"correct":22},"在作业时请电力设施的管理部门派员监管",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1112151,"承包单位如果仅申请施工临时用电，那么施工临时用电结束或施工用电转入建设项目电力设施供电，则总承包单位应及时向供电部门办理（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":29},"终止用电手续",{"key":24,"text":101,"correct":22},"新装用电手续",{"key":27,"text":103,"correct":22},"临时用电手续",{"key":31,"text":105,"correct":22},"变更用电手续",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1112152,"用户申请用电时，应向供电企业提供用电工程项目批准的文件及有关的用电资料不包括（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"电力用途",{"key":24,"text":113,"correct":22},"用电性质",{"key":27,"text":115,"correct":29},"用电路径",{"key":31,"text":117,"correct":22},"用电规划",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1112153,"在电力线路设施的保护范围中，属于架空电力线路的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":29},"避雷线",{"key":24,"text":125,"correct":22},"电缆沟",{"key":27,"text":127,"correct":22},"断路器",{"key":31,"text":129,"correct":22},"电力调度通信设施",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1112154,"在距电力设施周围500m 范围内进行()作业时，需征得电力设施产权单位的书面同意，并报经政府有关管理部门批准。",[134,136,138,140],{"key":20,"text":135,"correct":22},"堆物",{"key":24,"text":137,"correct":29},"爆破",{"key":27,"text":139,"correct":22},"井挖",{"key":31,"text":141,"correct":22},"钻探",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1112155,"按架空电力线路保护区内取土规定，200KV 杆塔周围禁止取土的范围是()。",[146,147,149,151],{"key":20,"text":75,"correct":29},{"key":24,"text":148,"correct":22},"6m",{"key":27,"text":150,"correct":22},"7m",{"key":31,"text":152,"correct":22},"8m",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":27,"analysis":33},1112156,"用电计量装置应有（）计量行政主管部门依法授权的计量检定机构检定。",[157,159,161,163],{"key":20,"text":158,"correct":22},"县级",{"key":24,"text":160,"correct":22},"市级",{"key":27,"text":162,"correct":29},"省级",{"key":31,"text":164,"correct":22},"国务院",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":27,"analysis":33},1112157,"关于用电计量与电费计收规定，正确的是（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"临时用电电度表可以使用后再补充检定",{"key":24,"text":172,"correct":22},"公用线路供电的高压用户，可在供电变压器出口装表计量",{"key":27,"text":174,"correct":29},"对10kV及以下电压供电的用户，应配置专用的电能计量柜",{"key":31,"text":176,"correct":22},"对35kV及以上电压供电的用户，应有专用的电流互感器二次线圈，与保护.测量回路共用",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},1112158,"某施工单位承担由 A 省到 B 省的长输管道的安装，应在施工前向()履行告知手续。",[181,183,185,187],{"key":20,"text":182,"correct":22},"A省质检总局",{"key":24,"text":184,"correct":22},"B省的质检总局",{"key":27,"text":186,"correct":29},"国家质检总局",{"key":31,"text":188,"correct":22},"以上三种均可",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},1112159,"特种设备出厂时，必须附有与安全有关的技术资料中不包括（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"锅炉质量证明书",{"key":24,"text":196,"correct":22},"安全阀排放量的计算书",{"key":27,"text":198,"correct":29},"销售许可证明",{"key":31,"text":200,"correct":22},"锅炉安装说明书",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},1112160,"特种设备安装、改造、修理的施工单位在施工前未履行书面告知手续的，责令限期改正，逾期未改正的，（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":29},"处1万元以上10万元以下罚款",{"key":24,"text":208,"correct":22},"处1万元以上20万元以下罚款",{"key":27,"text":210,"correct":22},"处5万元以上20万元以下罚款",{"key":31,"text":212,"correct":22},"处5万元以上50万元以下罚款",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},1112161,"压力容器安装前，应检查的内容不包括（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"生产许可证明",{"key":24,"text":220,"correct":22},"出厂技术文件",{"key":27,"text":222,"correct":22},"外观质量",{"key":31,"text":224,"correct":29},"强度试验证明",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":27,"analysis":33},1112162,"一般特种设备的安全技术档案不包括（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"监督检验证明",{"key":24,"text":232,"correct":22},"产品合格证明",{"key":27,"text":234,"correct":29},"能效测试报告",{"key":31,"text":236,"correct":22},"维修保养说明",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1112163,"下列管道中，属于GB类管道的是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"在产地和使用单位之间的用于输送油气商品介质的管道",{"key":24,"text":244,"correct":29},"民用的燃气管道",{"key":27,"text":246,"correct":22},"用于输送工艺介质的公用工程管道",{"key":31,"text":248,"correct":22},"火力发电厂输送蒸汽的管道",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":27,"analysis":33},1112164,"额定起重量大于或者等于（ ），且提升高度大于或者等于（ ）的起重机属于特种设备。",[253,255,257,259],{"key":20,"text":254,"correct":22},"2t2m",{"key":24,"text":256,"correct":22},"2t1m",{"key":27,"text":258,"correct":29},"3t2m",{"key":31,"text":260,"correct":22},"3t1m",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},1112165,"特种设备安全法规定，特种设备的()过程应当由特种设备检验检测机构进行监督检验。",[265,267,269,271],{"key":20,"text":266,"correct":29},"改造",{"key":24,"text":268,"correct":22},"装卸",{"key":27,"text":270,"correct":22},"运输",{"key":31,"text":272,"correct":22},"使用",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},1112166,"施工单位未履行“书面告知手续”，应责令限期整改;逾期未改正的，处()罚款。",[277,279,281,283],{"key":20,"text":278,"correct":29},"1万到10万",{"key":24,"text":280,"correct":22},"5万到20万",{"key":27,"text":282,"correct":22},"1万到5万",{"key":31,"text":284,"correct":22},"2万到5万",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},1112167,"下列工业安装工程验收顺序正确的是()。",[289,291,293,295],{"key":20,"text":290,"correct":22},"分项工程、单位工程、分部工程",{"key":24,"text":292,"correct":22},"分部工程、分项工程、单位工程",{"key":27,"text":294,"correct":22},"单位工程、分部工程、分项工程",{"key":31,"text":296,"correct":29},"分项工程、分部工程、单位工程",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},1112168,"工业安装分部工程验收的组织者是()。",[301,303,305,307],{"key":20,"text":302,"correct":22},"监理工程师",{"key":24,"text":304,"correct":29},"建设单位质量技术负责人",{"key":27,"text":306,"correct":22},"施工单位项目负责人",{"key":31,"text":308,"correct":22},"建设单位项目负责人",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":31,"analysis":33},1112169,"工业自动化仪表安装分项工程应按仪表类别和安装（ ）进行划分。",[313,315,317,319],{"key":20,"text":314,"correct":22},"施工程序",{"key":24,"text":316,"correct":22},"施工方法",{"key":27,"text":318,"correct":22},"试验要求",{"key":31,"text":320,"correct":29},"试验工序",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":27,"analysis":33},1112170,"经返修或加固处理的分项、分部工程，虽然改变外形尺寸但仍能满足安全使用要求，可按（ ）和协商文件进行验收。",[325,327,329,331],{"key":20,"text":326,"correct":22},"设计图纸",{"key":24,"text":328,"correct":22},"设计变更",{"key":27,"text":330,"correct":29},"技术方案",{"key":31,"text":332,"correct":22},"合同文件",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":20,"analysis":33},1112171,"虽然检测测定达不到设计要求，但经原设计单位核算认可能满足结构安全和使用功能的检验项目可判定为（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":29},"验收通过",{"key":24,"text":340,"correct":22},"让步接收",{"key":27,"text":342,"correct":22},"协商通过",{"key":31,"text":344,"correct":22},"试用鉴定",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":20,"analysis":33},1112172,"钢结构工程按（ ）划分检验批，便于质量验收，及时控制安装质量。",[349,351,353,355],{"key":20,"text":350,"correct":29},"工序",{"key":24,"text":352,"correct":22},"施工工艺",{"key":27,"text":354,"correct":22},"制作",{"key":31,"text":356,"correct":22},"焊接",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1112173,"工业安装的单位工程划分原则不包括（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"按厂房",{"key":24,"text":364,"correct":29},"按专业",{"key":27,"text":366,"correct":22},"按车间",{"key":31,"text":368,"correct":22},"按区域",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":20,"analysis":33},1112174,"下列属于单位工程划分原则的是()。",[373,375,377,379],{"key":20,"text":374,"correct":29},"工业厂房",{"key":24,"text":376,"correct":22},"钢结构",{"key":27,"text":378,"correct":22},"台（套）机组",{"key":31,"text":380,"correct":22},"土建",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":31,"analysis":33},1112175,"经有资质的检测机构检测鉴定达不到设计要求，但经()核算认可能够满足安全和使用功能的检验项目（检验批），可予以验收。",[385,387,389,391],{"key":20,"text":386,"correct":22},"建设单位",{"key":24,"text":388,"correct":22},"监理单位",{"key":27,"text":390,"correct":22},"施工单位",{"key":31,"text":392,"correct":29},"原设计单位",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":27,"analysis":33},1112176,"建筑安装工程分部工程划分的原则是()。",[397,399,401,403],{"key":20,"text":398,"correct":22},"按主要工种、材料来确定",{"key":24,"text":400,"correct":22},"按设备类别来确定",{"key":27,"text":402,"correct":29},"按专业性质、工程部位来确定",{"key":31,"text":404,"correct":22},"按施工工艺来确定",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":31,"analysis":33},1112177,"建筑安装分部工程验收的组织者是()。",[409,410,411,412],{"key":20,"text":302,"correct":22},{"key":24,"text":304,"correct":22},{"key":27,"text":306,"correct":22},{"key":31,"text":308,"correct":29},{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":24,"analysis":33},1112178,"建筑安装工程的分项工程可按()划分。",[417,419,420,421],{"key":20,"text":418,"correct":22},"专业性质",{"key":24,"text":352,"correct":29},{"key":27,"text":314,"correct":22},{"key":31,"text":422,"correct":22},"建筑部位",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":31,"analysis":33},1112179,"建筑安装工程进行质量验收评定的工作程序是（ ）。",[427,429,431,433],{"key":20,"text":428,"correct":22},"检验批验收→分部（子分部）工程验收→分项工程验收→单位（子单位）工程验收",{"key":24,"text":430,"correct":22},"检验批验收→单位（子单位）工程验收→分部（子分部）工程验收→分项工程验收",{"key":27,"text":432,"correct":22},"检验批验收→分项工程验收→单位（子单位）工程验收→分部（子分部）工程验收",{"key":31,"text":434,"correct":29},"检验批验收→分项工程验收→分部（子分部）工程验收→单位（子单位）工程验收",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":24,"analysis":33},1112180,"检验批检查的资料不包括（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":22},"图纸会审.设计变更.洽商记录",{"key":24,"text":442,"correct":29},"质量验收记录",{"key":27,"text":444,"correct":22},"材料.构配件.设备的质量证明书",{"key":31,"text":446,"correct":22},"隐蔽工程检查记录",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":31,"analysis":33},1112181,"建筑安装分项工程质量验收的组织人员是（ ）。",[451,452,453,455],{"key":20,"text":308,"correct":22},{"key":24,"text":306,"correct":22},{"key":27,"text":454,"correct":22},"施工单位技术负责人",{"key":31,"text":456,"correct":29},"监理单位监理工程师",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},1112182,"建筑工程的分项工程可按（ ）划分。",[461,462,463,464],{"key":20,"text":418,"correct":22},{"key":24,"text":352,"correct":29},{"key":27,"text":314,"correct":22},{"key":31,"text":422,"correct":22},{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":31,"analysis":33},1112183,"所有检验批均应由（ ）或建设单位项目技术负责人组织验收。",[469,471,473,475],{"key":20,"text":470,"correct":22},"施工项目部质量员",{"key":24,"text":472,"correct":22},"企业质量管理部门",{"key":27,"text":474,"correct":22},"项目部主管质量副经理",{"key":31,"text":302,"correct":29},{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":24,"analysis":33},1112184,"不属于建筑安装工程的主控项目有()。",[480,482,484,486],{"key":20,"text":481,"correct":22},"管道压力试验",{"key":24,"text":483,"correct":29},"观感质量",{"key":27,"text":485,"correct":22},"电气的绝缘性能",{"key":31,"text":487,"correct":22},"电气接地测试",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},1112185,"机电工程注册建造师执业的机电安装工程不包括（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"净化工程",{"key":24,"text":495,"correct":29},"机组升压站工程",{"key":27,"text":497,"correct":22},"动力站工程",{"key":31,"text":499,"correct":22},"工业炉窑安装工程",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":27,"analysis":33},1112186,"下列属于冶炼工程范围的是（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":22},"氧气站",{"key":24,"text":507,"correct":22},"煤气站",{"key":27,"text":509,"correct":29},"焦化工程",{"key":31,"text":511,"correct":22},"工业炉窑安装",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},1112187,"下列工程项目，不属于动力安装工程的是（ ）。",[516,518,520,521],{"key":20,"text":517,"correct":22},"锅炉房",{"key":24,"text":519,"correct":22},"热水交换站",{"key":27,"text":507,"correct":22},{"key":31,"text":522,"correct":29},"制氧工程",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":27,"analysis":33},1112188,"制氧工程属于机电建造师执业范围中的（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"机电安装工程",{"key":24,"text":530,"correct":22},"石油化工工程",{"key":27,"text":532,"correct":29},"冶炼工程",{"key":31,"text":534,"correct":22},"电力工程",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":27,"analysis":33},1112189,"煤气工程属于（ ）。",[539,540,541,542],{"key":20,"text":528,"correct":22},{"key":24,"text":530,"correct":22},{"key":27,"text":532,"correct":29},{"key":31,"text":534,"correct":22},{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},1112190,"根据机电工程注册建造师签章文件类别要求，属于安全管理签章文件的是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"特种作业人员资格审查表",{"key":24,"text":550,"correct":22},"单位工程安全和功能检验资料",{"key":27,"text":552,"correct":22},"施工环境保护措施及管理方案报审表",{"key":31,"text":554,"correct":29},"现场临时用电申请书",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":24,"analysis":33},1112191,"下列工程项目中，属于机电工程注册建造师执业工程范围的是（ ）。",[559,560,562,564],{"key":20,"text":509,"correct":22},{"key":24,"text":561,"correct":29},"环保工程",{"key":27,"text":563,"correct":22},"煤气工程",{"key":31,"text":565,"correct":22},"核电工程",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":27,"analysis":33},1112192,"火电工程包括主厂房建筑、烟囱、（ ）、机组安装、锅炉安装、汽轮发电机安装、升压站、环保工程、附属工程等工程项目。",[570,572,574,576],{"key":20,"text":571,"correct":22},"医疗器械",{"key":24,"text":573,"correct":22},"送变电工程",{"key":27,"text":575,"correct":29},"冷却塔",{"key":31,"text":577,"correct":22},"天然气储库",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":31,"analysis":33},1112193,"合同管理文件中不包括（ ）。",[582,584,586,588],{"key":20,"text":583,"correct":22},"材料采购总计划表",{"key":24,"text":585,"correct":22},"工程分包合同",{"key":27,"text":587,"correct":22},"劳务分包合同",{"key":31,"text":328,"correct":29},{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":20,"analysis":33},1112194,"下列泵类中，属于按工作原理分类的是（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":29},"容积式泵",{"key":24,"text":596,"correct":22},"杂质泵",{"key":27,"text":598,"correct":22},"耐腐蚀泵",{"key":31,"text":600,"correct":22},"清水泵",[602,605,608,611,614,617],{"id":15,"name":603,"category":7,"favorite":604},"领导干部任职前廉政法规知识测试题",92,{"id":606,"name":607,"category":7,"favorite":15},595,"建筑结构与设备",{"id":609,"name":610,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":612,"name":613,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":615,"name":616,"category":7,"favorite":8},534,"BIM工程师",{"id":618,"name":616,"category":7,"favorite":8},535]