[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-787-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},787,"二建机电工程实务","建筑工程",0,5,50,2160,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,188,200,212,224,236,248,260,272,284,296,308,320,332,344,356,368,378,390,402,413,425,437,449,461,473,485,497,509,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1112042,1,"单选题","在自动扶梯空载制动试验中，应检查符合标准规范要求的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","制动荷载",false,{"key":24,"text":25,"correct":22},"B","制动方法",{"key":27,"text":28,"correct":22},"C","空载速度",{"key":30,"text":31,"correct":32},"D","制停距离",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1112043,"下列不属于按电梯用途分类的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"私人电梯",{"key":24,"text":41,"correct":22},"客货电梯",{"key":27,"text":43,"correct":22},"船用电梯",{"key":30,"text":45,"correct":22},"消防电梯",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1112044,"液压电梯施工程序中，“千斤顶安装”紧后的工作是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"机房内配件安装",{"key":24,"text":53,"correct":32},"液压配管",{"key":27,"text":55,"correct":22},"导轨安装",{"key":30,"text":57,"correct":22},"轿厢组装",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1112045,"自动人行道自动停止运行时，开关断开的动作不用通过安全触点或安全电路来完成的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":32},"过载",{"key":24,"text":65,"correct":22},"踏板下陷",{"key":27,"text":67,"correct":22},"扶手带入口保护装置动作",{"key":30,"text":69,"correct":22},"附加制动器动作",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},1112047,"建筑管道中排水主立管应进行（）试验。",[74,76,78,80],{"key":20,"text":75,"correct":22},"压力试验",{"key":24,"text":77,"correct":22},"泄漏性试验",{"key":27,"text":79,"correct":22},"通水试验",{"key":30,"text":81,"correct":32},"通球试验",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1112048,"下面分项工程中不属于建筑饮用水供应系统的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"水处理设安装",{"key":24,"text":89,"correct":32},"给水管道安装",{"key":27,"text":91,"correct":22},"管道及配件安装",{"key":30,"text":93,"correct":22},"防腐",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1112049,"关于建筑管道的安装，下列说法错误的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"冷热水管道上下平行安装时热水管道应在冷水管道上方",{"key":24,"text":101,"correct":32},"冷热水管道垂直安装时热水管道在冷水管道右侧",{"key":27,"text":103,"correct":22},"室内生活污水管道应按铸铁管.塑料管等不同材质及管径设置排水坡度，铸铁管的坡度应高于塑料管的坡度",{"key":30,"text":105,"correct":22},"室外排水管道的坡度必须符合设计要求，严禁无坡或倒坡",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1112050,"关于生活污水塑料管道的坡度，其管径75mm的最小坡度为（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"4‰",{"key":24,"text":113,"correct":22},"5‰",{"key":27,"text":115,"correct":32},"8‰",{"key":30,"text":117,"correct":22},"12‰",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1112051,"关于热水供应系统水压试验的说法，不正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"热水供应系统安装完毕，管道保温之前应进行水压试验",{"key":24,"text":125,"correct":22},"试验压力应符合设计要求",{"key":27,"text":127,"correct":32},"一般水压试验压力应为系统顶点的工作压力加0.2MPa",{"key":30,"text":129,"correct":22},"系统顶点的试验压力不小于0.3MPa",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1112052,"高层建筑的雨水系统采用（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":32},"镀锌焊接钢管",{"key":24,"text":137,"correct":22},"镀锌无缝钢管",{"key":27,"text":139,"correct":22},"塑料管",{"key":30,"text":141,"correct":22},"球墨铸铁管",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1112053,"室内给水金属立管管道支架设置要求不包括（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"楼层高度5m的每层不少于1个",{"key":24,"text":149,"correct":22},"楼层高度大于5m每层设置不少于2个",{"key":27,"text":151,"correct":32},"管道支架高度距地面为2m",{"key":30,"text":153,"correct":22},"同一区域内管架设置高度应一致",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1112054,"建筑室内给水管道施工程序中，“管道支架制作”之前的程序是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":32},"管道测绘放线",{"key":24,"text":161,"correct":22},"管道元件检验",{"key":27,"text":163,"correct":22},"管道加工预制",{"key":30,"text":165,"correct":22},"系统试验",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1112055,"下面分项工程中不属于室内给水系统的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"消毒",{"key":24,"text":173,"correct":22},"室内消火栓安装",{"key":27,"text":175,"correct":32},"室外消火栓安装",{"key":30,"text":177,"correct":22},"管道冲洗",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1112056,"室内隐蔽或埋地的排水管在隐蔽前，必须做（ ）。",[182,183,184,186],{"key":20,"text":75,"correct":22},{"key":24,"text":81,"correct":22},{"key":27,"text":185,"correct":32},"灌水试验",{"key":30,"text":187,"correct":22},"泄漏试验",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},1112057,"安装在主干管上的起切断作用的闭路阀门，每批数量中应（ ）进行强度和严密性试验。",[192,194,196,198],{"key":20,"text":193,"correct":22},"抽取5%，且不少于1个",{"key":24,"text":195,"correct":32},"100%",{"key":27,"text":197,"correct":22},"抽取10%，且不少于1个",{"key":30,"text":199,"correct":22},"抽取20%，且不少于2个",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},1112058,"管道安装在楼板内的套管，其顶部应高出装饰地面（ ）mm；安装在卫生间及厨房内的套管，其顶部应高出装饰地面（ ）mm，底部应与楼板底面相平。",[204,206,208,210],{"key":20,"text":205,"correct":22},"20；30",{"key":24,"text":207,"correct":32},"20；50",{"key":27,"text":209,"correct":22},"30；20",{"key":30,"text":211,"correct":22},"30；50",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1112059,"建筑室内给水管道安装工序后的正确顺序是（）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"系统清洗、消毒→系统压力试验→防腐绝热→系统通水试验",{"key":24,"text":219,"correct":32},"系统压力试验→防腐绝热→系统清洗、消毒→系统通水试验",{"key":27,"text":221,"correct":22},"系统压力试验→系统清洗、消毒-防腐绝热→系统通水试验",{"key":30,"text":223,"correct":22},"防腐绝热→系统压力试验→系统清洗、消毒→系统通水试验",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},1112060,"施工方案经济评价的常用方法是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"等值成本法",{"key":24,"text":231,"correct":32},"综合评价法",{"key":27,"text":233,"correct":22},"技术节约措施法",{"key":30,"text":235,"correct":22},"价值工程法",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":27,"analysis":33},1112061,"需要做经济分析的主要施工方案不包括（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"特大设备运输方案",{"key":24,"text":243,"correct":22},"综合系统试验方案",{"key":27,"text":245,"correct":32},"给水管道焊接方案",{"key":30,"text":247,"correct":22},"采用新技术的施工方案",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},1112062,"下列不属于与特种设备作业人员的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":32},"架子工",{"key":24,"text":255,"correct":22},"压力容器焊工",{"key":27,"text":257,"correct":22},"压力管道探伤工",{"key":30,"text":259,"correct":22},"司炉工",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":30,"analysis":33},1112063,"下列特种作业人员不能立即上岗作业的是（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"持证焊工",{"key":24,"text":267,"correct":22},"两年半未复审的起重工",{"key":27,"text":269,"correct":22},"离岗4个月的电工",{"key":30,"text":271,"correct":32},"离岗8个月的架子工",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":24,"analysis":33},1112064,"对于离开特种作业岗位（ ）以上的特种作业人员，上岗前必须重新进行考核，合格后方可上岗作业。",[276,278,280,282],{"key":20,"text":277,"correct":22},"一年",{"key":24,"text":279,"correct":32},"6个月",{"key":27,"text":281,"correct":22},"3个月",{"key":30,"text":283,"correct":22},"8个月",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},1112065,"编制一般的无损检测程序，并按检测工艺独立进行检测操作，评定检测结果，签发检测报告是（ ）无损检测人员的检测工作。",[288,290,292,294],{"key":20,"text":289,"correct":22},"Ⅰ级",{"key":24,"text":291,"correct":32},"Ⅱ级",{"key":27,"text":293,"correct":22},"Ⅲ级",{"key":30,"text":295,"correct":22},"实习检验员",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":27,"analysis":33},1112066,"在材料进场时，项目部进行材料数量和质量验收的依据不包括（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"送料凭证",{"key":24,"text":303,"correct":22},"进料计划",{"key":27,"text":305,"correct":32},"施工图纸",{"key":30,"text":307,"correct":22},"质量保证书",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},1112067,"施工现场材料管理的全面领导责任人是（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":32},"项目经理",{"key":24,"text":315,"correct":22},"材料员",{"key":27,"text":317,"correct":22},"项目部主管材料员",{"key":30,"text":319,"correct":22},"项目工长",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":27,"analysis":33},1112068,"下列无损检测人员的操作不符合要求的是（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":22},"Ⅰ级检测人员进行无损检测操作",{"key":24,"text":327,"correct":22},"Ⅰ级检测人员记录监测数据",{"key":27,"text":329,"correct":32},"Ⅱ级检测人员编制无损检测工艺",{"key":30,"text":331,"correct":22},"Ⅲ级检测人员解释检测结果",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":27,"analysis":33},1112069,"下列选项中个，不属于施工技术交底类型的是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"设计交底",{"key":24,"text":339,"correct":22},"项目总体交底",{"key":27,"text":341,"correct":32},"合同交底",{"key":30,"text":343,"correct":22},"变更交底",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},1112070,"下列关于施工技术交底的要求中，说法正确的是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":32},"施工技术交底必须以批准的施工组织设计、施工方案为依据",{"key":24,"text":351,"correct":22},"技术交底以口头约定为准",{"key":27,"text":353,"correct":22},"技术交底应在施工过程中进行",{"key":30,"text":355,"correct":22},"无须向施工操作人员进行技术交底",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},1112071,"下列选项中，属于按变更内容性质进行设计变更分类的是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":32},"重大设计变更",{"key":24,"text":363,"correct":22},"直接设计变更",{"key":27,"text":365,"correct":22},"普通设计变更",{"key":30,"text":367,"correct":22},"小型设计变更",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},1112072,"对项目部职能部门、专业技术负责人和主要施工负责人进行的交底属于（ ）。",[372,373,374,376],{"key":20,"text":337,"correct":22},{"key":24,"text":339,"correct":32},{"key":27,"text":375,"correct":22},"单位工程技术交底",{"key":30,"text":377,"correct":22},"分部分项工程技术交底",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},1112073,"机电工程有多个单位工程组成时，工程文件应按（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":32},"单位工程组卷",{"key":24,"text":385,"correct":22},"分部工程组卷",{"key":27,"text":387,"correct":22},"子分部工程组卷",{"key":30,"text":389,"correct":22},"分项工程组卷",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":30,"analysis":33},1112074,"下列工程变更中，不属于重大设计变更的是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"工艺方案变化",{"key":24,"text":397,"correct":22},"增加单项工程",{"key":27,"text":399,"correct":22},"扩大设计规模",{"key":30,"text":401,"correct":32},"满足用户需求",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":27,"analysis":33},1112075,"下列选项中，不属于施工技术交底依据的是（ ）",[406,408,410,412],{"key":20,"text":407,"correct":22},"项目质量策划",{"key":24,"text":409,"correct":22},"施工组织设计",{"key":27,"text":411,"correct":32},"资源供应情况",{"key":30,"text":305,"correct":22},{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":30,"analysis":33},1112076,"下列选项中，不属于施工技术交底注意事项的是（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"施工技术交底前，应准备相关资料",{"key":24,"text":420,"correct":22},"交底内容要详尽、涵盖整个施工过程",{"key":27,"text":422,"correct":22},"交底要有可操作性",{"key":30,"text":424,"correct":32},"交底表达方式要复杂、专业",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":27,"analysis":33},1112077,"下列不属于横道图缺点的是（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":22},"不反映工作逻辑关系",{"key":24,"text":432,"correct":22},"不能反映工作机动时间",{"key":27,"text":434,"correct":32},"不能将实际进度和计划进度进行比较",{"key":30,"text":436,"correct":22},"不能反映出影响工期的关键工作",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":30,"analysis":33},1112078,"下图是某设备安装施工进度计划，该机电工程进度计划的总工期是（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":22},"85天",{"key":24,"text":444,"correct":22},"110天",{"key":27,"text":446,"correct":22},"160天",{"key":30,"text":448,"correct":32},"180天",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":20,"analysis":33},1112079,"采用横道图的方式所表达的进度计划，可以通过（ ）来进行偏差分析。",[453,455,457,459],{"key":20,"text":454,"correct":32},"计划线长度与实际线长度比较法",{"key":24,"text":456,"correct":22},"列表比较法",{"key":27,"text":458,"correct":22},"S曲线比较法",{"key":30,"text":460,"correct":22},"前锋线比较法",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1112080,"下列因素中，会影响施工图纸提供不及时的因素是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"拖欠工程进度款",{"key":24,"text":468,"correct":32},"规范标准的修订",{"key":27,"text":470,"correct":22},"现场的管控能力",{"key":30,"text":472,"correct":22},"新施工技术交底",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},1112081,"下列关于进度计划的相关表述中，错误的是（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"横道图不能明确反映关键工作和关键线路",{"key":24,"text":480,"correct":32},"横道图能反映出工作所具有的机动时间",{"key":27,"text":482,"correct":22},"网络图能够明确表达各项工作之间的逻辑关系",{"key":30,"text":484,"correct":22},"横道图不利于施工进度的动态控制",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},1112082,"施工进度计划调整的对象是（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"主要工作",{"key":24,"text":492,"correct":32},"关键工作",{"key":27,"text":494,"correct":22},"非关键工作",{"key":30,"text":496,"correct":22},"次要工作",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":27,"analysis":33},1112083,"下列关于机电工程进度计划编制要点的说法中，错误的是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"确定机电工程的施工顺序",{"key":24,"text":504,"correct":22},"突出主要分部分项工程",{"key":27,"text":506,"correct":32},"满足先地上后地下的施工顺序",{"key":30,"text":508,"correct":22},"满足先干线后支线的施工顺序",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":27,"analysis":33},1112084,"下列施工程序中，不作为质量控制点的是（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"焊缝无损检测",{"key":24,"text":516,"correct":22},"设备安装水平度偏差",{"key":27,"text":518,"correct":32},"设备安装时间",{"key":30,"text":520,"correct":22},"设备安装垂直度偏差",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":30,"analysis":33},1112085,"质量事故的特点不包括（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"复杂性",{"key":24,"text":528,"correct":22},"严重性",{"key":27,"text":530,"correct":22},"可变性",{"key":30,"text":532,"correct":32},"偶然性",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":27,"analysis":33},1112086,"下列检验，不属于“三检制”的是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"自检",{"key":24,"text":540,"correct":22},"互检",{"key":27,"text":542,"correct":32},"送检",{"key":30,"text":544,"correct":22},"专检",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":27,"analysis":33},1112087,"影响下道工序质量的质量控制点应由（ ）检查确认并签证。",[549,551,553,555],{"key":20,"text":550,"correct":22},"由施工.监理和业主三方质检人员",{"key":24,"text":552,"correct":22},"业主和施工双方质检人员",{"key":27,"text":554,"correct":32},"施工和监理双方质检人员",{"key":30,"text":556,"correct":22},"由施工方质检人员自行",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},1112088,"下列情况中，可向建设单位提出费用索赔的是（）",[561,563,565,567],{"key":20,"text":562,"correct":22},"施工单位的设备被暴雨淋湿而产生的费用",{"key":24,"text":564,"correct":32},"建设单位增加工作量造成的费用增加",{"key":27,"text":566,"correct":22},"施工单位施工人员高处坠落受伤产生的费用",{"key":30,"text":568,"correct":22},"监理单位责令剥离检查未报检的隐蔽工程而产生的费用",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":30,"analysis":33},1112089,"分包方的职责不包括（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"保证分包工程的质量.安全.工期及环境保护，满足总承包合同的要求",{"key":24,"text":576,"correct":22},"编制分包工程施工方案",{"key":27,"text":578,"correct":22},"及时向总承包方提供分包工程的有关资料",{"key":30,"text":580,"correct":32},"向建设单位提供质量资料",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":24,"analysis":33},1112090,"下列情况中不能进行合同变更的是（）",[585,587,589,591],{"key":20,"text":586,"correct":22},"增加合同中的工作",{"key":24,"text":588,"correct":32},"取消合同中工作，转由他人实施",{"key":27,"text":590,"correct":22},"改变合同中工作的质量标准",{"key":30,"text":592,"correct":22},"改变工程的尺寸",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":24,"analysis":33},1112091,"项目总工程师对本工程项目的安全生产负（）。",[597,599,601,603],{"key":20,"text":598,"correct":22},"全面领导责任",{"key":24,"text":600,"correct":32},"技术责任",{"key":27,"text":602,"correct":22},"直接领导责任",{"key":30,"text":604,"correct":22},"间接领导责任",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":30,"analysis":33},1112092,"生产经营单位应急预案编制程序中不包括的是（ ）。 ?",[609,611,613,615],{"key":20,"text":610,"correct":22},"成立应急预案编制工作组",{"key":24,"text":612,"correct":22},"资料收集",{"key":27,"text":614,"correct":22},"应急能力评估",{"key":30,"text":616,"correct":32},"配备必要应急设备",[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]